Itsekiri RDC opens bid for rigid pavement, solar powered light, land reclamation, other projects

* We will issue out the contracts after due analysis – Ag. Chairman, Orugbo


By: | on | 2593 views
Topic: News


Itsekiri RDC opens bid for rigid pavement, solar powered light, land reclamation, other projects
The Project Engineer, IRDC, Engr. Mathias Pessu (middle) conducting the bid opening


 

 

The Itsekiri Regional Development Committee, IRDC, under the NNPC/Chevron Nigeria Limited JV GMoU Governance Model, on Friday June 17, opened bid for rigid pavement, solar powered light, land reclamation, housing, town hall, concrete road and other strategic infrastructural projects in the 23 IRDC communities, encapsulating the 2021/2022 Projects’ circle of the community development committee.

 

 

Video Clip of the Interviews/Bid Opening

 

 

A breakdown of the projects dominated by Housing Units across the three IRDC fields, revealed plans to construct 0.56km Rigid Pavement LOT 2 in Bateren, Warri South-West Local Government Area, Town Hall and 0.3Km Concrete Road in Kolokolo, Warri North Local Government Area, 0.38km internal Asphalt Road and Provision of 2 no’s 20,000 litres solar powered Water Project with Perimeter Fence and Gate at Omadino, Warri South Local Government Area, 0.3km reinforced concrete walkway and provision of solar powered light at Obaghoro, Warri North Local Government Area, Provision of Solar Powered Light at Sagharatie, Warri North Local Government Area, 0.14km rigid pavement at Tebu, Warri North Local Government Area, Concrete walkway and Town Hall at Tisun, Warri North Local Government Area, Community Fish Market and Choko oven as well as Supply of 40Hp Yamaha engine and fiber boat (W19) with divers’ gears and Provision of Solar Powered Light at Udo, Warri North Local Government Area, concrete walkway at Ugboegungun, Warri South-West Local Government Area as well as land reclamation at Ureju and Usor both in Warri North Local Government Area.

 

From right: Prince Moses Fregene, Richard Omare Esq., Itse Orugbo & Oti-Reece Edukugho Esq. (left)

 

The Ag. Chairman of Itsekiri Regional Development Committee, IRDC, Mr. Itse Orugbo, in an interview shortly after the bid opening at IRDC Office in Warri, Delta State, assured that the bids would be properly analyzed and the contracts awarded, “in a very short time, so that people will have the benefit of IRDC”.

 

“We are going to separate all the 23 communities, because each of the communities, may have up to four, five or six bidders. The bid duration is 6months, from past records, many of the contractors finished the building projects between 2 to 3 months, some even less than 2 months. We wish to complete the projects, maximum six months-time”.

 

 

The Chairman of IRDC Communication Committee, Oti-Reece Edukugho Esq., who spoke in the same vein, stressed that the leadership of IRDC was a stickler for due process as it affects needs’ assessment, analyzing of bids and award of contracts.

 

 

A Cross Section of some of IRDC (communities) contractors

 

 

The bid opening ceremony, witnessed by the Community Engagement Rep, Chevron Nigeria Limited, Mr. Femi Abode and exco members of the IRDC, was described as transparent by few community contractors, who spoke on behalf of their colleagues in Itsekiri language.


Copyright: Fresh Angle International (www.freshangleng.com)
ISSN 2354 - 4104


Sponsored Ad




Our strategic editorial policy of promoting journalism, anchored on the tripod of originality, speed and efficiency, would be further enhanced with your financial support. Your kind contribution, to our desire to become a big global brand, should be credited to our account:

Fresh Angle Nig. Ltd
ACCOUNT NUMBER: 0130931842.
BANK GTB.



Sponsored
Sponsored Ads