Work slows down on Lagos-Ibadan rail line

Work has slowed down along the Iju-Agege axis of Lagos-Ibadan Rail Line,


By: | on | 922 views
Topic: News


Work slows down on Lagos-Ibadan rail line
Rt. Hon. Rotimi Amaechi, at the Iju-Agege axis of Lagos-Ibadan Rail Line


Work has slowed down along the Iju-Agege axis of Lagos-Ibadan Rail Line, Fresh Angle International can report.

 

This much was disclosed this afternoon via a tweet by the Minister of Transportation, Rt. Hon. Rotimi Amaechi, shortly after his team carried out their monthly inspection of the Lagos-Ibadan rail line.

 

The Minister tweeted: “On our monthly inspection of the Lagos-Ibadan rail line today, I noticed that work has slowed down along the Iju-Agege axis, and I've directed that the contractors put in more work and get the track to Ikeja ASAP”.

 

He added: “The ongoing work at the Kajola Station has improved greatly and I've asked the Contractors to source some materials locally to encourage manufacturing & jobs for Nigerians while maintaining high quality; and to replicate same speed at the other stations on the Lagos-Ibadan route.”

 

 

Rt. Hon. Rotimi Amaechi ( 2nd right) during the inspection

 


Copyright: Fresh Angle International (www.freshangleng.com)
ISSN 2354 - 4104


Sponsored Ad



Tonebsky Nesta
Tonebsky Nesta is the pen name for Metsese Anthony Ebule, Co-Publisher/Editor-In-Chief
Read other stories by Tonebsky Nesta

Our strategic editorial policy of promoting journalism, anchored on the tripod of originality, speed and efficiency, would be further enhanced with your financial support. Your kind contribution, to our desire to become a big global brand, should be credited to our account:

Fresh Angle Nig. Ltd
ACCOUNT NUMBER: 0130931842.
BANK GTB.



Sponsored
Sponsored Ads